1 General Provisions
2 Terminology
3 Basic Requirements
3.1 Equipment Unpacking Inspection and Storage
3.2 Civil Works
3.3 Equipment and System Erection
4 Steam Turbine Proper
4.1 General Provisions
4.2 Turbine Proper Foundation
4.3 Soleplates and Pad Blocks
4.4 Casing,Bearing Pedestals and Sliding Pin System
4.5 Bearing and Oil Baffle
4.6 Steam Turbine Rotor
4.7 Installation of Equipment in Flow Passage
4.8 Turning Gear and Speed Reducer
4.9 Cylinder Covering
4.10 Secondary Grouting and Curing
4.11 Documentation for Quality Acceptance
5 Generator and Excitation Device
5.1 General Provisions
5.2 Bearing Pedestals and Bearing
5.3 Stator
5.4 Generator Rotor
5.5 Stator Position Adjustment and Cover Closing
5.6 Shaft Sealing and Gas Cooling System of Hydrogen-cooled and Water-hydrogen-hydrogen-cooled Generator
5.7 Water Inlet/Outlet Support and Cooler
5.8 Cooling Water System
5.9 Excitation Device
5.10 Documentation for Quality Acceptance
6 Regulation and Protection Device and Oil System
6.1 General Provisions
6.2 Electro-hydraulic Regulation and Protection Device
6.3 Hydraulic Regulation and Protection Device
6.4 Steam Valve and Its Driving Device
6.5 Centrifugal Main Oil Pump
6.6 Control Oil System
6.7 Lubricating Oil System
6.8 Sealing Oil System of Hydrogen-cooled Generator
6.9 Documentation for Quality Acceptance
7 Piping of Steam Turbine
7.1 General Provisions
7.2 Valves and Special Parts
7.3 Installation of Piping
7.4 Documentation for Quality Acceptance
8 Auxiliary Equipment
8.1 General Provisions
8.2 Condenser
8.3 Air Cooling Device
8.4 Extraction Equipment
8.5 Heat Exchanger
8.6 Tanks and Deaerator
8.7 Temperature and Pressure Reducer
8.8 Documentation for Quality Acceptance
9 Accessory Machinery
9.1 General Provisions
9.2 Installation of Accessory Machinery
9.3 Common Centrifugal Pumps
9.4 Feed Water Pump Units and Their Associated Devices
9.5 Vertical Pumps
9.6 Deep Well Pumps
9.7 Air Cooling and Water Cooling Fans
9.8 Rotating Filter
9.9 Documentation for Quality Acceptance
10 Bridge Crane,Casing in Insulation and Enclosure
10.1 Bridge Crane
10.2 Insulation and Painting of Steam Turbine Equipments
10.3 Enclosure,Platform,Ladder and Cover of Steam Turbine
10.4 Documentation for Quality Acceptance
11 Regulation,Start-up and Trial Run of Turbo-generator
11.1 General Provisions
11.2 Trial Run of Accessory Machinery
11.3 Purging and Flushing of Steam-water Pipelines
11.4 Leakage Check of Steam Turbine Vacuum System
11.5 Trial Run of Steam Turbine Auxiliary Equipment
11.6 Trial Run of Oil System and Oil Flushing
11.7 General Provisions for Entire System Start-up and Trial Run
11.8 Adjustment and Testing of the Control System and Automatic Protective Devices Prior to Start-up of Steam Turbine
11.9 Start-up and No-load Trial Run of Turbo-generators
11.10 Hydrogen Filling of Generator and Operation of Hydrogen System
11.11 Trial Run of Dual Internal Water Cooled Generator and Water-hydrogen-hydrogen-cooled Generator
11.12 Hot Flushing of Air Cooling System
11.13 Trial Run of Turbo-generator with Load
11.14 Documentation for Quality Acceptance
Appendix A Requirements for Construction of Mortar and Pads for S/T Soleplate
Appendix B Mix Proportion for Cylinder Coating
Appendix C Common Sealing Material Types and Scope of Application
Appendix D Common Grease Types and Scope of Application
Appendix E Physical Performance of Common S/T Bolting Materials
Appendix F Sag Calculation Formula for Centering with Steel Wire
Appendix G Standard for Leakage Test of Generator Hydrogen System
Appendix H Unit Vibration Criterion
Appendix J Oil Quality Rating Criterion
Explanation of Wording in This Specification
List of Quoted Standards
Explanation of Provisions