Foreword
This code is developed by Sinopec Tenth Construction Company in cooperation with Sinopec Fourth Construction Company,Sinopec Fifth Construction Company and Wison Engineering Ltd based on the requirements of Document Jian Biao[2006]No.136 issued by original Ministry of Construction(MOC)-Notice on Printing the Development and Revision Plan of National Engineering Construction Standards(2nd Group)in 2006
In preparing this code,the development team made special studies,carried out extensive investigations,summarized the practices in petrochemical project construction in recent years,followed the guiding principles of Segregating Inspection and Assessment,Strengthening Quality Examination and acceptance,Improving Work Methods and Well Controlling Work Procedures,requested and consolidated comments from engineering design,construction and supervision services in a variety of ways,discussed the main issues and concerns focused,and reviewed and finalized this code.
This code comprises 12 chapters and 2 appendices.The main technical contents in this Code include:general provisions,terms,basic requirements,piping class,acceptance for piping materials,piping fabrication,piping welding,piping installation,piping weld examination and inspection,piping test,piping cleaning and technical documents of construction completion.
The provisions printed in bold type are compulsory and must be enforced strictly.
The Ministry of Housing and Urban-Rural Development of the People's Republic of China is in charge of administration of this code and explanation of the compulsory provisions,China Petrochemical Corporation(Sinopec Group)is responsible for its routine management,and Sinopec Tenth Construction Company is tasked for explanation of specific technical contents.All relevant organizations are kindly requested to sum up and accumulate your experiences in actual practices during the process of implementing this code.And relevant opinions and advices,whenever necessary,can be posted or passed on to Sinopec Tenth Construction Company(Address:No.29,Jianshe Road,Linzi District,Zibo City,Shandong Province,P.R.China,Post Code:255438,E-mail:gfz.shij@sinopec.com)for reference in future revision.
Chief development organization,participating development organizations and chief drafting staff,chief reviewing drafting staff of the code:
Chief development organization:
Sinopec Tenth Construction Company
Participating organizations:
Sinopec Fourth Construction Company
Sinopec Fifth Construction Company
Wison Engineering Ltd.
Chief drafting staff:
Xu Mingcai Wu Zhongxian Zhang Guihong Wang Qinghua
Zong Congbiao Shan Chengjia Wang Mingchun
Chief reviewing staff:
ZhangXigeng Ge Chunyu Xia Jiewen Qiu Ping Chen Yongliang
Hu Liangwei Ji Zhanghong Hu Guoyong Lu Tian Zhang Linqing
Zhang Pei Ma Yingxia Wang Li Chu Changchun Wang Yongshou