1 General Provisions
1.0.1 This code is prepared with a view to enhance the quality management of mineral processing equipment installation engineering,carry out uniformly the acceptance of mineral processing equipment installation engineering and guarantee the engineering quality.
1.0.2 This code is applicable to the installation quality acceptance of ore feeding and drawing equipment,crushing,grinding and sieving equipment,classifying and sorting equipment and dewatering equipment.
1.0.3 The requirements for installation quality as set forth in the engineering technical documents and contract documents adopted in the construction of mineral processing equipment installation engineering shall not be lower than the requirements specified in this code.
1.0.4 In addition to the requirements stipulated in this code,those stipulated in the current relevant standards of the nation shall be complied with.