14 Laying of Lines in Open Pit Mine
14.1 Dominant Items
14.1.1 High-voltage insulator shall pass the commissioning test specified in Article 2.1.5 of this code.
14.1.2 High-voltage power cable shall pass the commissioning test specified in Article 2.1.5 of this code.