GB51105-2015挤压钢管工程设备安装与验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

6.9 Installation of Manipulator

6.9.1 The manipulator shall be installed after the upsetting beam/piercing beam and expanding container have been installed.

6.9.2 When the manipulator is put inside,it is necessary to use the inside micrometer to adjust the axiality between the jaw and the container.