GB50607-2010高炉喷吹煤粉工程设计规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

3.5 Requirement on the Size and Moisture of Pulverized Coal

3.5.1 PCI should use fine coal for injection.Coal with size over 90μm should account for 20%-25% of the total pulverized coal.

3.5.2 The moisture of pulverized coal shall not be larger than 1.5%.