更新时间:2021-05-28 16:43:26
封面
书名页
版权页
Announcement of Ministry of Housing and Urban-Rural Development of the People s Republic of China
Foreword
1 General Provisions
2 Environment and Safety of Equipment Room
3 Installation and Wiring of Power Distribution and Converting System
3.1 Installation of Power Distribution and Converting System
3.2 Cable Tray Installation
3.3 Wiring
4 AC Power Supply System
4.1 Transformer
4.2 Diesel Generator Set
4.3 Uninterrupted Power Supply(UPS)System
5 DC Power Supply System
5.1 Live Test of Rectifier
5.2 Live Test of DC-DC Convertor
5.3 Live Test of Inverter
5.4 Photovoltaic Power Supply System
6 Battery
6.1 Battery Rack(Cabinet)Installation
6.2 Battery Installation
6.3 Charging and Discharging of Valve-Regulated Battery
7 Power and Environment Monitoring System
8 Acceptance
8.1 Follow-up Acceptance
8.2 Preliminary Acceptance
8.3 Trial Running
8.4 Final Acceptance
Explanation of Wording in This Code
List of Quoted Standards