8.12 Installation and Commissioning of Top Ignition Device

8.12.1 Gas and oxygen pipe interface connected with a burner shall meet the requirements of the design document and be free of air leakage.

8.12.2 The installation of the top ignition device shall meet the following requirements:

1 The longitudinal and transverse centerline of the frame base shall be checked by steel ruler through drawing the wire and hanging the pendant,with the allowable deviation of 5.0mm.

2 The elevation of the frame base shall be checked by level gaugeor steel ruler,with the allowable deviation of±5.0mm.

3 The maximum stroke of a blowing pipe shall be checked by steel ruler,with the allowable deviation of±5.0mm.

4 The center line of the track shall be checked by steel ruler,with the allowable deviation of 5.0mm.

5 The straightness of the track shall be checked by steel ruler through drawing the wire,with the allowable deviation of 5.0mm.

6 The height difference between two tracks in the same cross section shall be checked by level gauge,with the allowable variation of 5.0mm.

7 The track span shall be checked by steel ruler,with the allowable deviation of±5.0mm.

8 The allowable deviation of overlap ratio of the center lines of a driving chain wheel and a driven chain wheel of the driving mechanism is 1.0mm.

8.12.3 The commissioning of the top ignition device shall meet the following requirements:

1 A running gear of a manual burner shall move forward and backward without barrier,and it shall be free of friction with the hole edge when passing through an ignition hole.

2 The running gear of an electric burner shall move forward and backward,the position of the limit switch shall be adjusted and the requirements of the design document shall be met.

3 The running gear of the burner shall move forward and backward at least 3 times.Its action shall be flexible and be free of abnormal sound and vibration.The action of the limit switch shall be flexible and reliable.