参考文献
[1]周建亮,李文娟,梁丹琦.工程总承包模式及其在煤炭建设项目中的应用分析
[J].工程管理学报,2011,25(2):182 186.
[2]Haviland.TheArchitects'HandBookofProfessionalPractice[R].TheAmerican
InstituteofArchitects,1985.
[3]GreenfieldSS.TurnkeyConstructionintheUnitedStates[J].JournaloftheCon-
structionDivision(ASCE),1982,108(2):201 210.
[4]UnitedNations.FeaturesandIssuesinTurnkeyContractsinDevelopingCountries
[R].United NationsCentreon TransnationalCorporations,1990.
[5]DBIA.AnIntroductiontoDesign-Build[R].Design-BuildInstituteofAmerica,1994.[6]FIDIC.ConditionsofContractforEPCTurnkeyProjects[R].FIDIC,1999.
[7]中华人民共和国住房和城乡建设部,中华人民共和国国家工商行政管理总局.建设
项目工程总承包合同示范文本(试行,GF—2011—0216)[R].2011.
[8]国家发改委等9部委.关于印发简明标准施工招标文件和标准设计施工总承包招标
文件的通知(发改法规【2011】3018号)[R].中华人民共和国标准设计施工总
承包招标文件(2012年版).2011.
[9]ASCE.QualityintheConstructedProject:A GuideforOwners,DesignersandCon-
tractors(SecondEdition)[M].AmericanSocietyofCivilEngineers,Reston,Vir-ginia,2000.
[10]PietroforteR,MillerJB.ProcurementmethodsforUSinfrastructure:historicalper-
spectiveandrecenttrends[J].BuildingResearchandInformation,2002,30(6):425 434.
[11]Winch G M.InstitutionalreforminBritishconstruction:partneringandprivatefi-
nance[J].BuildingResearchandInformation,2000,28(1):141 155.
[12]ReevesK.ConstructionbusinesssysteminJapan:generalcontractorsandsubcontrac-
tors[J].BuildingResearchandInformation,2002,30(6):413 424.
[13]SongerA D,MolenaarK R.Selectivedesign-build:publicandprivatesectorowner's
attitudes[J].JournalofConstructionEngineeringandManagement,1996,12(6):47 53.
[14]TenahK.Thedesign-buildprojectdeliverysystem:anoverview[J].CostEngineer-
ing,2000,42(3):31 37.
[15]SamiF,GeorgeJ.Design-builddeliverysystem ontrial[J].AACEInternational
Transactions,2004.
[16]孟宪海,次仁顿珠,赵启.EPC总承包模式与传统模式之比较[J].国际经济合
作,2004(11):49 50.
[17]王伍仁,罗能钧.从EPC工程总承包看大型建筑业企业的成长路径[J].建筑经
济,2006(1):34 38.
[18]王学通.基于不确定多属性理论的总承包工程交易模式决策研究[D].哈尔滨:
哈尔滨工业大学,2010.
[19]TheConstructionIndustryInstituteDesign-BuildResearchTeam[R].ProjectDeliv-
erySystems:CM atrisk,Design-Build,andDesign-Bid-Build[R].ResearchSum-mary133 1.Austin,TX:ConstructionIndustryInstitute,1997.
[20]SchaufelbergerJE.PrivateSectorProjectDelivery[J].AACEInternationalTrans-
actions,2002.
[21]KoncharM,SanvidoV.ComparisonofU.S.projectdeliverysystem[J].Journalof
ConstructionEngineeringand Management,1998,124(6):435 444.
[22]BennettJ,PothecaryE,RobinsonG.DesignandBuildinga WorldClassIndustry:
ReadingDesign-BuildForum[M].Reading,CenterforStrategicStudiesinCon-struction,UniversityofReading,Reading,UK,1996.
[23]GransbergD D,Badillo-KwiatkowskiG M,MolenaarK R.Projectdeliverycompari-
sonusingperformancemetrics[C].2003AACEInternationalTransactions,2003.
[24]RileyD R,DillerBE,KerrD.Effectsofdeliverysystemsonchangeordersizeand
frequencyin mechanicalconstruction[J].JournalofConstruction Engineeringand Management,2005,131(9),953 962.
[25]HaleD R,ShresthaP P,Gibson G E,etal.EmpiricalComparisonofDesign-Build
andDesign-Bid-BuildProjectDelivery Methods[J].JournalofConstruction Engi-neeringandManagement,2009,135(7):579 588.
[26]RosnerJW,ThalAE,WestCJ.AnalysisoftheDesign-Builddeliverymethodin
airforceconstructionprojects[J].JournalofConstructionEngineeringand Manage-ment,2009,135(8):710 717.
[27]Ibbs W C,Kwak Y H,Ng T,etal.Projectdeliverysystemsandprojectchange:
Quantitativeanalysis[J].JournalofConstruction Engineeringand Management,2003,129(4):382 387.
[28]LingF Y Y,KerhS H.Comparingtheperformanceofdesign-buildanddesign-bid-
buildbuildingprojectsinSingapore[J].ArchitecturalScienceReview,2004,47(6):163 176.
[29]FederalHighway Administration(FHWA).Design-Build EffectivenessStudy[R].
Washington,DC:USDOT-FederalHighway Administration,2006.
[30]ShresthaPP,MigliaccioG C,O'ConnorJT,etal.Bench-markingoflargedesign-
buildhighwayprojects:One-to-onecomparisonandcomparison with DBB projects[J].TransportationResearchRecord,2007(1994):17 25.
[31]ShresthaPP,O'ConnorJT,Gibson G E.PerformanceComparisonofLargeDe-
sign-BuildandDesign-Bid-Build HighwayProjects[J].JournalofConstructionEngi-neeringandManagement,2012,138(1):1 13.
[32]WaterDesign-BuildCouncil(WDBC).IndependentcomparativeevaluationofDesign-
Buildv.conventionalDesign-Bid-Buildprojectdeliveryfor municipalwaterand wastewaterfacilities[R].Washington,DC:WaterDesign-BuildCouncil,2009.
[33]BogusS M,ShaneJenniferS,MolenaarK R.Comparisonofwater/wastewaterpro-
jectperformancebyprojectdeliverysystemandpaymentprovision[C].Construction ResearchCongress2010,2010:859 868.
[34]ShaneJS,BogusS M,MolenaarK R.Municipalwater/wastewaterprojectdelivery
performancecomparison[J].Journal of Managementin Engineering,2013,29(3):251-258.
[35]MolenaarK R,etal.WashingtonStateDepartmentofTransportationDesign-Build
PilotProject Evaluation:A Measurementof Performancefor The Process[R]. Cost,Time,and Quality,2003.
[36]洪伟民,王卓甫,王敏.建设工程不同交易方式总成本比较研究[J].建筑经济,
2007,(9):18 21.
[37]MohammedI,KhalilA.SelectingtheappropriateprojectdeliverymethodusingAHP
[J].InternationalJournalofProjectManagement,2002(20):469 474.
[38]Ibrahim M M,KhaledA.Decisionsupportsystemforselectingtheproperprojectde-
liverymethodusinganalyticalhierarchyprocess(AHP)[J].InternationalJournalof ProjectManagement,2005(23):564 572.
[39]朱定勤.高速公路项目管理模式评价[J].公路,2006(5):164 168.
[40]AlhazmiT,McCafferR.Projectprocurementsystemselectionmodel[J].Construc-
tionEngineeringand Management,2000,126(3):176 184.
[41]LingF Y Y,Liu M.Usingneuralnetworktopredictperformanceofdesign-build
projectsinSingapore[J].BuildingandEnvironment,2004(39):1263 1274.
[42]OyetunjiaA,AndersonS.Relativeeffectivenessofprojectdeliveryandcontractstrat-
egies[J].JournalofConstruction Engineeringand Management,2006,132(1):3 13.
[43]李慧敏,王卓甫.建设工程发包方式的谱分析与设计模型[J].科技进步与对策,
2009,26(21):91 94.
[44]洪伟民,刘红梅,王卓甫.基于熵权模糊综合评判法的工程交易模式决策[J].
科技管理研究,2010(3):122 125.
[45]陈勇强,焦俊双,张扬冰.工程项目交易方式选择的影响因素及选择方法[J].
国际经济合作,2010(2):51 55.
[46]王卓甫,简迎辉.工程项目管理:模式与创新[M].北京:中国水利水电出版
社,2006.
[47]王卓甫,杨高升,洪伟民.建设工程交易理论与交易模式[M].北京:中国水利
水电出版社,2010.