工程总承包管理理论与实务
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

参考文献

[1]周建亮,李文娟,梁丹琦.工程总承包模式及其在煤炭建设项目中的应用分析

[J].工程管理学报,2011,25(2):182 186.

[2]Haviland.TheArchitects'HandBookofProfessionalPractice[R].TheAmerican

InstituteofArchitects,1985.

[3]GreenfieldSS.TurnkeyConstructionintheUnitedStates[J].JournaloftheCon-

structionDivision(ASCE),1982,108(2):201 210.

[4]UnitedNations.FeaturesandIssuesinTurnkeyContractsinDevelopingCountries

[R].United NationsCentreon TransnationalCorporations,1990.

[5]DBIA.AnIntroductiontoDesign-Build[R].Design-BuildInstituteofAmerica,1994.[6]FIDIC.ConditionsofContractforEPCTurnkeyProjects[R].FIDIC,1999.

[7]中华人民共和国住房和城乡建设部,中华人民共和国国家工商行政管理总局.建设

项目工程总承包合同示范文本(试行,GF—2011—0216)[R].2011.

[8]国家发改委等9部委.关于印发简明标准施工招标文件和标准设计施工总承包招标

文件的通知(发改法规【2011】3018号)[R].中华人民共和国标准设计施工总

承包招标文件(2012年版).2011.

[9]ASCE.QualityintheConstructedProject:A GuideforOwners,DesignersandCon-

tractors(SecondEdition)[M].AmericanSocietyofCivilEngineers,Reston,Vir-ginia,2000.

[10]PietroforteR,MillerJB.ProcurementmethodsforUSinfrastructure:historicalper-

spectiveandrecenttrends[J].BuildingResearchandInformation,2002,30(6):425 434.

[11]Winch G M.InstitutionalreforminBritishconstruction:partneringandprivatefi-

nance[J].BuildingResearchandInformation,2000,28(1):141 155.

[12]ReevesK.ConstructionbusinesssysteminJapan:generalcontractorsandsubcontrac-

tors[J].BuildingResearchandInformation,2002,30(6):413 424.

[13]SongerA D,MolenaarK R.Selectivedesign-build:publicandprivatesectorowner's

attitudes[J].JournalofConstructionEngineeringandManagement,1996,12(6):47 53.

[14]TenahK.Thedesign-buildprojectdeliverysystem:anoverview[J].CostEngineer-

ing,2000,42(3):31 37.

[15]SamiF,GeorgeJ.Design-builddeliverysystem ontrial[J].AACEInternational

Transactions,2004.

[16]孟宪海,次仁顿珠,赵启.EPC总承包模式与传统模式之比较[J].国际经济合

作,2004(11):49 50.

[17]王伍仁,罗能钧.从EPC工程总承包看大型建筑业企业的成长路径[J].建筑经

济,2006(1):34 38.

[18]王学通.基于不确定多属性理论的总承包工程交易模式决策研究[D].哈尔滨:

哈尔滨工业大学,2010.

[19]TheConstructionIndustryInstituteDesign-BuildResearchTeam[R].ProjectDeliv-

erySystems:CM atrisk,Design-Build,andDesign-Bid-Build[R].ResearchSum-mary133 1.Austin,TX:ConstructionIndustryInstitute,1997.

[20]SchaufelbergerJE.PrivateSectorProjectDelivery[J].AACEInternationalTrans-

actions,2002.

[21]KoncharM,SanvidoV.ComparisonofU.S.projectdeliverysystem[J].Journalof

ConstructionEngineeringand Management,1998,124(6):435 444.

[22]BennettJ,PothecaryE,RobinsonG.DesignandBuildinga WorldClassIndustry:

ReadingDesign-BuildForum[M].Reading,CenterforStrategicStudiesinCon-struction,UniversityofReading,Reading,UK,1996.

[23]GransbergD D,Badillo-KwiatkowskiG M,MolenaarK R.Projectdeliverycompari-

sonusingperformancemetrics[C].2003AACEInternationalTransactions,2003.

[24]RileyD R,DillerBE,KerrD.Effectsofdeliverysystemsonchangeordersizeand

frequencyin mechanicalconstruction[J].JournalofConstruction Engineeringand Management,2005,131(9),953 962.

[25]HaleD R,ShresthaP P,Gibson G E,etal.EmpiricalComparisonofDesign-Build

andDesign-Bid-BuildProjectDelivery Methods[J].JournalofConstruction Engi-neeringandManagement,2009,135(7):579 588.

[26]RosnerJW,ThalAE,WestCJ.AnalysisoftheDesign-Builddeliverymethodin

airforceconstructionprojects[J].JournalofConstructionEngineeringand Manage-ment,2009,135(8):710 717.

[27]Ibbs W C,Kwak Y H,Ng T,etal.Projectdeliverysystemsandprojectchange:

Quantitativeanalysis[J].JournalofConstruction Engineeringand Management,2003,129(4):382 387.

[28]LingF Y Y,KerhS H.Comparingtheperformanceofdesign-buildanddesign-bid-

buildbuildingprojectsinSingapore[J].ArchitecturalScienceReview,2004,47(6):163 176.

[29]FederalHighway Administration(FHWA).Design-Build EffectivenessStudy[R].

Washington,DC:USDOT-FederalHighway Administration,2006.

[30]ShresthaPP,MigliaccioG C,O'ConnorJT,etal.Bench-markingoflargedesign-

buildhighwayprojects:One-to-onecomparisonandcomparison with DBB projects[J].TransportationResearchRecord,2007(1994):17 25.

[31]ShresthaPP,O'ConnorJT,Gibson G E.PerformanceComparisonofLargeDe-

sign-BuildandDesign-Bid-Build HighwayProjects[J].JournalofConstructionEngi-neeringandManagement,2012,138(1):1 13.

[32]WaterDesign-BuildCouncil(WDBC).IndependentcomparativeevaluationofDesign-

Buildv.conventionalDesign-Bid-Buildprojectdeliveryfor municipalwaterand wastewaterfacilities[R].Washington,DC:WaterDesign-BuildCouncil,2009.

[33]BogusS M,ShaneJenniferS,MolenaarK R.Comparisonofwater/wastewaterpro-

jectperformancebyprojectdeliverysystemandpaymentprovision[C].Construction ResearchCongress2010,2010:859 868.

[34]ShaneJS,BogusS M,MolenaarK R.Municipalwater/wastewaterprojectdelivery

performancecomparison[J].Journal of Managementin Engineering,2013,29(3):251-258.

[35]MolenaarK R,etal.WashingtonStateDepartmentofTransportationDesign-Build

PilotProject Evaluation:A Measurementof Performancefor The Process[R]. Cost,Time,and Quality,2003.

[36]洪伟民,王卓甫,王敏.建设工程不同交易方式总成本比较研究[J].建筑经济,

2007,(9):18 21.

[37]MohammedI,KhalilA.SelectingtheappropriateprojectdeliverymethodusingAHP

[J].InternationalJournalofProjectManagement,2002(20):469 474.

[38]Ibrahim M M,KhaledA.Decisionsupportsystemforselectingtheproperprojectde-

liverymethodusinganalyticalhierarchyprocess(AHP)[J].InternationalJournalof ProjectManagement,2005(23):564 572.

[39]朱定勤.高速公路项目管理模式评价[J].公路,2006(5):164 168.

[40]AlhazmiT,McCafferR.Projectprocurementsystemselectionmodel[J].Construc-

tionEngineeringand Management,2000,126(3):176 184.

[41]LingF Y Y,Liu M.Usingneuralnetworktopredictperformanceofdesign-build

projectsinSingapore[J].BuildingandEnvironment,2004(39):1263 1274.

[42]OyetunjiaA,AndersonS.Relativeeffectivenessofprojectdeliveryandcontractstrat-

egies[J].JournalofConstruction Engineeringand Management,2006,132(1):3 13.

[43]李慧敏,王卓甫.建设工程发包方式的谱分析与设计模型[J].科技进步与对策,

2009,26(21):91 94.

[44]洪伟民,刘红梅,王卓甫.基于熵权模糊综合评判法的工程交易模式决策[J].

科技管理研究,2010(3):122 125.

[45]陈勇强,焦俊双,张扬冰.工程项目交易方式选择的影响因素及选择方法[J].

国际经济合作,2010(2):51 55.

[46]王卓甫,简迎辉.工程项目管理:模式与创新[M].北京:中国水利水电出版

社,2006.

[47]王卓甫,杨高升,洪伟民.建设工程交易理论与交易模式[M].北京:中国水利

水电出版社,2010.